PV system at sauber+stark in operation
07/2023 - Back to overview
W.E.B installed a photovoltaic system on the roof of yet another company. The rooftops of the waste collection center of sauber+stark in Waidhofen an der Thaya were equipped with a PV system of 423 kWp. The PV modules generated their first kilowatt hour of solar power in late June – the new plant will produce almost 440,000 kWh of clean energy every year. The system is designed for sauber+stark to use the generated solar power on site. If the PV modules deliver more electricity than the company needs, the surplus will be fed into the public power grid.